Home Up Search

 JMU Wind Turbine Raising

Up

 

Mark Lotts and Jon Miles prepare for the installation

Mark and Jon in the bucket

Heading up in a large Cherry Picker.

A small crowd was on hand for the event

The turbine ready to be lifted

Dueling cranes

Positioning the turbine

Getting closer

Attaching the turbine to the tower

 

Copyright © 2004 Chesapeake Renewable Energy, LLC                                     
Last modified: 11/12/08